General information
|
Title of the investment proposal (project) |
Starting-up of a pellet production plant |
|
Location (district, city/village, street), land photo, scheme of location
|
Chernivtsi region, Vyzhnytsa, Ukrains’ka str, 100
|
|
Owner (owners) |
«Vyzhnytsa WPC» JSC, 1100 shareholders |
|
Available documents, that certify the ownership (official act, certificate of ownership) |
Certificate of ownership |
|
Preliminary cost (balanced cost, assessed value) ths. UAH |
2160,0 |
|
The actual usage |
Not in use |
|
Technical parameters of a land lot |
|
|
Area of the available land lot, ha |
6,7 |
|
Border surroundings (description, scheme) |
Borders on the public autoroad, railway station in Vyzhnytsa, «Interdosstan» LTD |
|
Level difference on the land lot, m |
Flat ground |
|
Cadastral end use |
Industrial production |
|
Proposed end use |
Industrial production |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No limitations |
|
Technical parameters of buildings and structures |
|
|
Area of the premises, m2 |
3000,0 |
|
Type and condition of buildings and premises |
Industrial premises – 2500 m2, storage houses – 500 m2; in good condition |
|
Year of construction |
1986 |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate about the ownership) |
Act of putting into operation, certificate about the ownership |
|
Utilities |
|
|
Water (availability, parameters) |
Centralized water supply |
|
Drainage system (availability, parameters) |
Centralized drainage system of Vyzhnytsa |
|
Supplying with gas (availability, parameters) |
Available, medium pressure – 0,3 mPa. |
|
Electricity (availability, parameters) |
Available, 1030 kw |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Automobile road with hard surface |
|
The nearest international airport, km, time |
International airport «Chernivtsі», 75 km, 1 hour |
|
The nearest entry point, km |
Entry point «Porubne», 85 km |
|
The nearest autoroads of international and national significance, km |
Distance to state auto-road Т-26-01 – 100 m |
|
The nearest railway station, km |
Railway station Vyzhnytsa, 100 m |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Department of economic development and trade of district state administration, e-mail: [email protected] |
|
Contact (name, position, telephone N, e-mail) |
Fedoroschyak M. – Head of the Department of economic development and trade, tel: +38(03730)21354, e-mail: [email protected] |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Reconstruction of the brick factory «Ceramic LTD» |
|
Location (street, city/village, district), land photo, scheme of location
|
3, Druzhby str., Hertsa district, Hertsa, Chernivtsi region
|
|
Owner (owners) |
Buildings and production capacities of «Ceramic LTD». Lands of reserve of Hertsa city council (official act on permanent right of use) |
|
Available documents certifying the ownership (official act, certificate of ownership) |
Cadastral plan of a land lot |
|
Preliminary cost, ths. UAH |
Starting price: 1,5 mln. $ |
|
The actual usage |
Brick factory |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
12,0 |
|
Border surroundings (description, scheme) |
on the North – lands of city council on the South – lands of Prykordonnyk JSC on the East – lands of village council on the West – autoroad Т2606 |
|
Level difference on the land lot, m |
1-3 m |
|
Cadastral end use |
For production activity |
|
Proposed end use |
Production of high-quality bricks and ceramical blocks, natural tile |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No ecological or constructional limitations |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
18000 m2 |
|
Type and condition of buildings and premises |
Administrative building, storage rooms, production shops. Capital facilities – 3000 m2, sheds: 15000 m2 |
|
Year of construction |
Before 1985 |
|
Available documents |
Official act on permanent right of use of land, inventory documents |
|
Utilities |
|
|
Water (availability, parameters) |
Man-made (water) storage reservoir, 2 wells |
|
Drainage system (availability, parameters) |
Placing of local treatment facilities |
|
Supplying with gas (availability, parameters) |
Not available, to the nearest pipeline – 1 km |
|
Electricity (availability, parameters) |
Available, 1,0 kw |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Gravel autoroad, 1 km to the autoroad Т2606 |
|
The nearest international airport, km, time |
International airport «Chernivtsi» – 24 km |
|
The nearest entry point, km |
Entry point with Romania, «Dyakivtsi» (customs post «Dyakivtsi» of Chernivtsi Customs – 1,5 km |
|
The nearest autoroads of international and national significance, km |
Next to the autoroad Т2606 |
|
The nearest railway station, km |
Railway station «Novoselytsa» – 6 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
«Ceramic LTD» |
|
Contact (name, position, telephone N, e-mail) |
Bilyk Ruslana, tel: +38(0372)553547, +38(050) 5196336 |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Snowpark Horbovo |
|
Location (district, city/village, street), land photo, scheme of location
|
Horbovo vil., Bancheny vil., Hertsa district, Chernivtsi region, Ukraine
|
|
Owner (owners) |
Private enterprise «Company «Skyservice» |
|
Available documents that certify the ownership (official act, certificate of ownership) |
Certificate of ownership (04.09.2006 NЯЯЯ 933004-005), land tenancy agreement for the period of 49 years |
|
Preliminary cost, ths.UAH |
Funds invested in the project’s 1-st turn – 1150 ths. US$ |
|
Project description |
Providing services for winter sports and entertainment. II turn of project will cover: 3 4-seater ropeways and 3 lifting devices; 3 restaurants with infrastructure and a coffee-house; 2 hotel complexes with infrastructure; 2 administrative buildings; 1 open-air skating rink; 5 ski slopes |
|
Project stage |
I turn of project is completed in 2006:
|
|
Project total cost, ths.UAH/ths. USD |
Investment requirement for the II turn of the project – 2500 ths USD. |
|
Project pay-back period |
8 years |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
45,2019 ha, including 6 ha of flat ground for infrastructure construction |
|
Border surroundings (description, scheme) |
Auto-road, communities lands of Horbovo and Bancheny of Hertsa district
|
|
Level difference on the land lot, m |
Up to 120 m, slope grade – 22-25% |
|
Cadastral end use |
For farming – 44,42 ha, lands for sports – 0,7742 |
|
Proposed end use |
During the winter period – mountain skiing |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No limitations |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
296,1 m2 |
|
Type and condition of buildings and premises |
Capital facilities, good condition, 296,1 m2 |
|
Available documents |
Certificate of ownership (04.09.2006) |
|
Year of construction |
2006 |
|
Utilities |
|
|
Water (availability, parameters) |
Available, autonomic sources of drinking and process water |
|
Drainage system (availability, parameters) |
Available, autonomic system of water treatment |
|
Supplying with gas (availability, parameters) |
Available, supplied with gas since 2007 |
|
Electricity (availability, parameters) |
High-voltage electrical substation 35/0,4 kw with capacity 1600 kw |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Next to state autoroad Chernivtsi-Hertsa |
|
The nearest international airport, km, time |
International airport «Chernivtsi» – 20 km. |
|
The nearest entry point, km |
«Porubne», 60 km |
|
The nearest autoroads of international and national significance, km |
State autoroad Chernivtsi-Hertsa |
|
The nearest railway station, km |
Railway station «Chernivtsi», 20 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Private enterprise «Company «Skyservice», |
|
Contact person |
Kolodnitskyi Oleh, tel: +38(050)5063504 |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Construction of the medical center «Hertsaivski Dzherela» and bottling shop for mineral water «Hertsaivs’ka Dzherelna» |
|
Location (district, city/village, street), land photo, scheme of location
|
289-a, Tsentralna str., Hryatska vil. (south-western border), Hertsa district, Chernivtsi region
|
|
Owner (owners) |
«Hertsayvs’ki Dzherela» LTD, state registration certificate (15.01.2007 №585572) |
|
Project description |
Construction of the medical center using available mineral water resources for 287 persons, 5 two-storied cottages with 4 rooms each of them, shop for bottling mineral water with capacity of 14,8 mln. glass bottles per year, objects for treatment, recreation, consumer service and power-producing purposes. 259 new jobs will be created. |
|
Project stage |
The project was developed, there is an expertise; resolutions from all licensing authorities and permit to perform construction works (30.09.2008N03-355/08) were received. Pile field, drainage and vertical plan of a site were completed. Scientific research of mineral water was carried out and medical report (24.09.2010 N3850) was received. Special permit for using mineral wealth was received (24.09.2010 N3850). |
|
Project total cost, ths.UAH/ths. USD |
Project investment fund in the prices of 2010 –229,1 mln.UAH. Investment requirement for the project realization for the present moment – 20 mln. Euro on the term of joint activity. |
|
Project pay-back period |
3 years and 2 months |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
4,3483 |
|
Available documents, that certify the ownership (official act, certificate of ownership) |
Tenancy agreement on land for the period of 49 years (29.12.2007) |
|
Normative monetary evaluation of land,ths.UAH |
366,909 |
|
The actual usage |
Lands of reserve of Hryatska village council |
|
Border surroundings (description, scheme) |
Located next to auto-road Hryatska-Bairaky and borders on the lands of reserve of Hryatska village council |
|
Level difference on the land lot, m |
Mountainous landscape, 200 m above sea level |
|
Cadastral end use |
Pasture |
|
Proposed end use |
Medical center using available mineral water |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
Necessity to move transmission facilities outside the land lot |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No limitations |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
5778,42 |
|
Type and condition of buildings and premises |
Mineral water borehole with natural iodine content at the depth of 112 m, water salinity – 11-12,5 g/kg. Exploratory-industrial mineral prospecting is carried out since 2010. |
|
Available documents |
Project feasibility study developed by «Lvivagroproject», 2008; project expert's report (№52.08/2 13.10.2008) by SE «Ukrderzhbud-ekspertiza» |
|
Year of construction |
Construction is not started |
|
Utilities |
|
|
Water (availability, parameters) |
Construction of water supply pumping station |
|
Drainage system (availability, parameters) |
Placing the system of water treatment facilities «BIOTAL-200» |
|
Supplying with gas (availability, parameters) |
Not available |
|
Electricity (availability, parameters) |
Transmission facilities (10 kw) |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Next to gravel autoroad Hryatska – Bairaky. Distance to Hertsa – 10 km, to Chernivtsi – 40 km. |
|
The nearest international airport, km, time |
International airport «Chernivtsi» – 40 km, 60 min |
|
The nearest entry point, km |
7 km |
|
The nearest autoroads of international and national significance, km |
Е85-М19-Т2604 «Chernivtsi – Hertsa» – 6,1 km |
|
The nearest railway station, km |
Railway station «Novoselytsa» – 20,3 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
«Hertsaivski Dzherela» LTD, Hryatska vil., Hertsa district, Chernivtsi region |
|
Contact person |
Head – Meylik Borys +38(050)9818650 |
Investment proposal (project) application form of BROWNFIELD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Organization of production on the basis of property complex of former tractor crew |
|
Location (district, city/village, street), land photo, scheme of location
|
Doroshivtsi vil. (outside of the village), Zastavna district, Chernivtsi region |
|
Owner (owners) |
Persons: Vikliuk S., Pertiuk S., Mihalchan M. |
|
Available documents that certify the ownership (official act, certificate of ownership) |
Certificate of ownership |
|
Preliminary cost, ths. UAH |
100,0 ths.USD |
|
The actual usage |
Not in usage |
|
Technical parameters of a land lot |
|
|
Area of the available land lot, ha |
6 |
|
Border surroundings (description, scheme) |
Borders on: land lots for commercial farming; small pond establishment; territory of former hen house; fruit grove (at a distance of 100 m). The object’s territory is surrounded by access ways (gravel road and unsurfaced roads). |
|
Level difference on the land lot, m |
Flat ground |
|
Cadastral end use |
For industrial purposes |
|
Proposed end use |
Organization of production |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
Located outside of safeguard zone, no limitations |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
1402 |
|
Type and condition of buildings and premises |
There are on the land lot: administrative building – 449 m2, transformer substation, checkpoint – 17,8 m2, repair shop – 787 m2, boiler house – 148 m2. Condition of premises is good. |
|
Year of construction |
1970 |
|
Available documents |
Certificate of ownership |
|
Utilities |
|
|
Water (availability, parameters) |
Well, pond |
|
Drainage system (availability, parameters) |
There is a necessity of placing of local water treatment facilities |
|
Supplying with gas (availability, parameters) |
Not available. The nearest branch of gas supplying network – 0,5 km. |
|
Electricity (availability, parameters) |
Available. Transformer substation – 110 kw. |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Gravel autoroad |
|
The nearest international airport, km, time |
International airport «Chernivtsi» – 53 km, 1 hour. |
|
The nearest entry point, km |
Entry point with Moldova, Mamalyga-Cryva, 92 km |
|
The nearest autoroads of international and national significance, km |
E 85 «Ternopyl – Chernivtsi», 13 km |
|
The nearest railway station, km |
Railway station «Verenchanka» – 15 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page) |
Department of economic development and infrastructure of Zastavna district state administration (http://zastavnaeconomy.at.ua), Doroshivtsi village council |
|
Contact (name, position, telephone N, e-mail) |
Stasiuk Volodymyr, deputy head of the Department of economic development and infrastructure, tel./fax: +38(03737)31989, e-mail: [email protected]; Vygnan Mykola – head of the village council, tel.: +38(03737)35142 |
Investment proposal (project) application form of BROWNFIELD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Conversion of production on the base of «Zastavnivskyi Maslozavod» ALC |
|
Location (street, city/village, district), land photo, scheme of location
|
62, Bazhanskogo str, Zastavna, Zastavna district, Chernivtsi region
|
|
Owner (owners) |
Joint-stock company, (shareholders amount – 1092 persons) |
|
Available documents certifying the ownership (official act, certificate of ownership) |
Certificate of ownership, official act of permanent right of use of a land |
|
Preliminary cost, ths. UAH |
Residual value – 728,9 |
|
The actual usage |
Premises are dormant, only one of them is used on loan |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
2,1 |
|
Border surroundings (description, scheme) |
Borders on construction store territory, service station and other premises which are used by entrepreneurial entities for economic activity, access asphalt road (Bazhanskogo str.) and other housing facilities. |
|
Level difference on the land lot, m |
Flat ground, level difference up to 2 m. |
|
Cadastral end use |
For industrial purpose |
|
Proposed end use |
For industrial needs of the enterprise |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
Lower than 10 m. |
|
Limitations in use (due to construction, ecology etc.) |
No ecological or constructional limitations, located outside the safeguard zone |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
1,2 ths.m2 |
|
Type and condition of buildings and premises |
There are on the land lot: creamery shop, fat cheese production shop, boiler house, compressor house, automatic substation, administrative building. Condition of premises is adequate. |
|
Year of construction |
1953 |
|
Available documents |
Certificate of ownership |
|
Utilities |
|
|
Water (availability, parameters) |
Central water supply and drainage system, 100 m to the connection point. |
|
Drainage system (availability, parameters) |
|
|
Supplying with gas (availability, parameters) |
Pipeline of medium pressure, 300 m |
|
Electricity (availability, parameters) |
Available transformer substation. |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Ways of access: 2 autoroads – with hard surface and unsurfaced road, railway – railway station which serves the transportation of goods (250 m) |
|
The nearest international airport, km, time |
International airport «Chernivtsi» – 45 km, 1 hour |
|
The nearest entry point, km |
Entry point with Moldova, «Mamalyga-Cryva», 84 km |
|
The nearest autoroads of international and national significance, km |
E 85 «Ternopyl – Chernivtsi», 5 km |
|
The nearest railway station, km |
Railway station «Verenchanka» – 7 km, branch railway «Verenchanka – Vikna Bukovyny» serves only transportation of goods – 250 m |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Department of economic development and infrastructure of Zastavna district administration |
|
Contact (name, position, telephone N, e-mail) |
Stasiuk Volodymyr, deputy head of department of economic development and infrastructure, tel./fax: +38(03737)31989, e-mail: [email protected]; Kapitskyi Sergiy – head of «Zastavna Creamery» ALC, tel.: +38(03737)31301 |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Commercial center opening |
|
Location (district, city/village, street), land photo, scheme of location
|
Kelmentsi, Kelmentsi district, Chernivtsi region
|
|
Owner (owners) |
Kelmentsi town council |
|
Available documents, that certify the ownership (official act, certificate of ownership) |
Premises is in the tax pledge and ready for sale. Inventory file is prepared. |
|
Preliminary cost (balanced cost, assessed value) ths. UAH |
300,6 |
|
The actual usage |
Not in use |
|
Technical parameters of a land lot |
|
|
Area of the available land lot, ha |
0,17 |
|
Border surroundings (description, scheme) |
Premises is located not far from the town center and surrounded by living houses, kindergarten. Distance to residential areas – 7 m |
|
Level difference on the land lot, m |
Flat ground |
|
Cadastral end use |
Not determined (to maintain a boiler house) |
|
Proposed end use |
Reconstruction into a commercial center |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
According to the nature protection requirements |
|
Technical parameters of buildings and structures |
|
|
Area of the premises, m2 |
496,4 m² |
|
Type and condition of buildings and premises |
Total area of premises – 496,4 m²; roof – reinforced concrete slabs; walls – of bricks; floor – concrete; ceiling height – 5 m; premises is in need of repair. |
|
Year of construction |
1980-s |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate about the ownership) |
Premises is in tax pledge and ready for sale. Inventory file is prepared.
|
|
Utilities |
|
|
Water (availability, parameters) |
Water-pipe, parameters: pipe diameter – 50 mm, capacity – 6 m3 of water per hour |
|
Drainage system (availability, parameters) |
Central drainage system: pipe diameter – 150 mm, capacity – 6 m3 of water per hour |
|
Supplying with gas (availability, parameters) |
Distance to the connection point – 10 m |
|
Electricity (availability, parameters) |
Distance to electrical substation – 50 m |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Autoroads (gravel road: road width – 5 m, distance to asphalt road – 250 m) |
|
The nearest international airport, km, time |
International airport «Chernivtsi», 100 km, 2 hours. |
|
The nearest entry point, km |
Entry point «Kelmentsi», 7 km |
|
The nearest autoroads of international and national significance, km |
Autoroad Р63 Krokva - Vartykivtsi – Ivanivtsi - CP «Rososhany», 2 km |
|
The nearest railway station, km |
Railway station «Kelmentsi», 5 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Kelmentsi District State Administration, Kelmenci.oda.cv.ua |
|
Contact (name, position, telephone N, e-mail) |
Korol’ Serhii – Chief of the Sector of Investment and Tourism of Economic Development Department of District State Administration, tel. +38(03732) 20699, e-mail: [email protected] |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Reactivation of «Hutsuls’ki Vizerunky» company |
|
Location (district, city/village, street), land photo, scheme of location
|
12, Ukrains’ka str., Putyla, Chernivtsi region |
|
Owner (owners) |
Collective (253 shareholders) |
|
Available documents, that certify the ownership (official act, certificate of ownership) |
Land lot with the area of 0,89 ha is let by Putyla town council. Official act is not prepared |
|
Preliminary cost (balanced cost, assessed value) ths. UAH |
Assessed value is 408,7 ths. UAH (in prices of 2006). For the date of 01.01.2015 preliminary cost is 2 mln. UAH. |
|
The actual usage |
Wool processing factory, stand idle |
|
Technical parameters of a land lot |
|
|
Area of the available land lot, ha |
0,89 |
|
Border surroundings (description, scheme) |
Borders on the auto-road of local significance (Nezalejnosti str.), pasture and lands of a private owner |
|
Level difference on the land lot, m |
2 m |
|
Cadastral end use |
Construction and servicing of buildings and structures |
|
Proposed end use |
Resumption of activity of the company with profile retaining |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
According to the requirements of land ownership and good-neighborly relations |
|
Technical parameters of buildings and structures |
|
|
Area of the premises, m2 |
4198 m2 |
|
Type and condition of buildings and premises |
Industrial premises – 3200 m2; administrative buildings – 552 m2; storage capacities – 135 m2; others – 311 m2. All premises are in need of cosmetic repair. |
|
Year of construction |
1973 |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate of ownership) |
Available, certificate of ownership and act of putting into operation. |
|
Utilities |
|
|
Water (availability, parameters) |
Available, water supplying – from natural water sources. |
|
Drainage system (availability, parameters) |
Possibility of connection to the treatment facilities of Putyla, distance – 300 m. |
|
Supplying with gas (availability, parameters) |
Not available |
|
Electricity (availability, parameters) |
Electricity supplying with the capacity of 380 kw |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Autoroad with hard surface |
|
The nearest international airport, km, time |
International airport «Chernivtsi» - 118 km, 3 hours. |
|
The nearest entry point, km |
Checkpoint «Rus’ka» - 37 km |
|
The nearest autoroads of international and national significance, km |
Distance to the regional autoroad - 100 m, to the state road № Р-62 «Verhovyna-Chernivtsi» - 13 km |
|
The nearest railway station, km |
«Vyzhnytsa» - 43 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page) |
Economic Department of District State Administration, http://putyla.oda.cv.ua |
|
Contact (name, position, telephone N, e-mail) |
Shpaniuk Hanna – Head of the liquidation commission of «Hutsuls’ki Vizerunki» company, tel.: +38(096)6765541 |
Investment proposal (project) application form of BROWNFIЕLD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Constriction of the tourist complex on the mountain Tomna-Tikul (Pamir) |
|
Location (district, city/village, street), land photo, scheme of location
|
Chernivtsi region, Putyla district, former cantonment «Tomna – Тikul» №133 is located on the top of the mountain Tomnatic of Shepit village council
|
|
Owner (owners) |
Putyla district council (communal property) |
|
Available documents, that certify the ownership (official act, certificate of ownership) |
Presently land lot is being let out to the territorial public service center. Certificates of ownership and buildings inventory files are available. Certificate of land ownership is on the preparing stage. |
|
Preliminary cost (balanced cost, assessed value) ths. UAH |
Balanced cost – 5 mln. UAH (not including land value). Land value will be set according to the expert estimation. |
|
The actual usage |
The land lot is let out to the territorial public service center of Labour and Social Security Department of Putyla District State Administration |
|
Technical parameters of a land lot |
|
|
Area of the available land lot, ha |
17 |
|
Border surroundings (description, scheme) |
The land lot borders on hay lands of Selyatyn, Shepit, Dyhtynets village councils, Putyla and Carpathian specialized forestry. |
|
Level difference on the land lot, m |
There is a possibility to establish nearly 35 ski- and sledge tracks on the south-eastern and western sides of mountain valley slopes. Length of ski trail on the southern and northern slopes variates from 0,5 up to 3 km. Level of difference of heights on the land lot – 30-40 metres. |
|
Cadastral end use |
Construction and servicing of buildings and structures |
|
Proposed end use |
Construction of the international tourist complex for 1000 persons. |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
According to the requirements of land ownership and good-neighbourly relations, the land lot is proposed for long-period leasehold. |
|
Technical parameters of buildings and structures |
|
|
Area of the premises, m2 |
There are 5 ball-shaped constructions (cupolas) with the diameter 30-50 m, two-storeyed living house for 8 apartments and one-storeyed house, hotel (4 three-rooms apartments, barrack, garages, storage facilities and underground premises on the land lot. Area of buildings – 1430 m2. |
|
Type and condition of buildings and premises |
All buildings are in need of complete repair and reconstruction |
|
Year of construction |
1950 |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate of ownership) |
Documentation is on the preparing stage |
|
Utilities |
|
|
Water (availability, parameters) |
Water supplying is provided from the natural water sources. There is a necessity of reconstruction of water supply intake and setting up of a new water pipe. |
|
Drainage system (availability, parameters) |
Reconstruction of available autonomous water treatment facilities and setting up of a sewerage facilities. |
|
Supplying with gas (availability, parameters) |
Not available |
|
Electricity (availability, parameters) |
Available, electricity source with the capacity of 380 kw. |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Unsurfaced mountain road. Distance to the Shepit village - 18 km. |
|
The nearest international airport, km, time |
International airport «Chernivtsi» - 175 km, approximately 5 hours. |
|
The nearest entry point, km |
Checkpoint «Shepit-Іzvoarele Suchyavei», distance - 16 km. |
|
The nearest autoroads of international and national significance, km |
Distance to the nearest state road - 60 km. |
|
The nearest railway station, km |
«Vyzhnytsa» - 90 km. |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Economic Department of district state administration, http://putyla.oda.cv.ua |
|
Contact (name, position, telephone N, e-mail) |
Dutchak Andrii, Head of Putyla District Council, tel.: +38(03738)21437 |
Investment proposal (project) application form of BROWNFIELD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Construction of an artesian water bottling plant |
|
Location (district, city/village, street), land photo, scheme of location
|
119, Holovna str, Ozheve vil., Sokyriany district, Chernivtsi region
|
|
Owner (owners) |
Ozheve village council |
|
Available documents certifying the ownership (official act, certificate of ownership) |
Resolution of the session of Ozheve village council (19.12.2014 № 612/40-2014) «On the recognition of the communal ownership on the land lot with the area of 0,5 ha» |
|
Preliminary cost (balanced cost, assessed value), ths. UAH |
Preliminary balance value – 16,0 ths.UAH |
|
The actual usage |
Not in use |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
0,50 ha for artesian well maintenance |
|
Border surroundings (description, scheme) |
Artesian well is located in the center of the village on the land lot, that borders on the lands of village council communal property and lands of SPE «Krok» |
|
Level difference on the land lot, m |
Flat ground |
|
Cadastral end use |
For artesian well maintenance |
|
Proposed end use |
For artesian well maintenance |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No limitations |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
112 m² |
|
Type and condition of buildings and premises |
112 m² |
|
Year of construction |
1950 (approximately) |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate about the ownership) |
Not available |
|
Utilities |
|
|
Water (availability, parameters) |
Distance to the source – 100 m |
|
Drainage system (availability, parameters) |
Distance to the source – 100 m |
|
Supplying with gas (availability, parameters) |
Distance to the source – 500 m |
|
Electricity (availability, parameters) |
Available |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Autoroads (unsurfaced roads), 500 m |
|
The nearest international airport, km, time |
International airport «Chernivtsi», 160 km, 3 hours |
|
The nearest entry point, km |
International border crossing point «Sokyriany-Oknytsia», 15 km |
|
The nearest autoroads of international and national significance, km |
Sokyriany - Vinnytsia (through Novodnistrovsk) 2 km (asphalt road) |
|
The nearest railway station, km |
Railway station «Sokyriany», 25 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Ozheve village council, www: gromady.cv.ua/sk/rada /208 |
|
Contact (name, position, telephone N, e-mail) |
Head – Shevchiuk Raisa, tеl. +38(03739)54180, e-mail: [email protected] |
Investment proposal (project) application form of BROWNFIELD land lot
|
General information |
|
|
Title of the investment proposal (project) |
Dried fruit production |
|
Location (district, city/village, street), land photo, scheme of location |
85, Tsentralna str., Sokyriany, Chernivtsi region
|
|
Owner (owners) |
Sokyriany city council |
|
Available documents certifying the ownership (official act, certificate of ownership) |
Resolution of the session of Sokyriany city council 12.10.2012 № 399/27-12 |
|
Preliminary cost (balanced cost, assessed value), ths. UAH. |
500,0 |
|
The actual usage |
Not in use |
|
Technical parameters of a land lot |
|
|
Area of the available lot of land, ha |
0,4764 |
|
Border surroundings (description, scheme) |
Public lands, Tsentralna str., lands of «Remdor» LTD, lands of VKRC 328/67; lands of the city council (reserve) |
|
Level difference on the land lot, m |
Flat ground |
|
Cadastral end use |
Industrial |
|
Proposed end use |
Industrial |
|
Ground-based obstacles (risk of flood and landslide, ecological conditions) |
No obstacles |
|
Underground obstacles (level of surface and subterranean waters) |
No obstacles |
|
Limitations in use (due to construction, ecology etc.) |
No limitation |
|
Technical parameters of buildings and structures |
|
|
Area of premises, m2 |
696,0 |
|
Type and condition of buildings and premises |
696 m² (administrative buildings and warehouses); industrial facilities are exploitable, but in need of complete repairs. |
|
Year of construction |
1992 |
|
Available documents (inventory file, act of putting into operation, engineering documentation, certificate about the ownership) |
Not available |
|
Utilities |
|
|
Water (availability, parameters) |
Distance to the source – 500 m |
|
Drainage system (availability, parameters) |
Not available |
|
Supplying with gas (availability, parameters) |
Distance to the source – 700 m |
|
Electricity (availability, parameters) |
Distance to the source – 400 m |
|
Availability |
|
|
Ways of communication to the object (autoroads, railways) |
Autoroads (hard surface), 20 m |
|
The nearest international airport, km, time |
International airport «Chernivtsi», 150 km, 2,5 hours |
|
The nearest entry point, km |
International border crossing point «Sokyriany-Oknytsia», 5 km |
|
The nearest autoroads of international and national significance, km |
Р63 Dankivtsi-Kelmentsi-CP Sokyriany, 1 km |
|
The nearest railway station, km |
Railway station «Sokyriany», 5 km |
|
Contact information |
|
|
Proposal is provided by (organization, name of owner, Internet page ) |
Sokyriany city council, www: sok-city.cv.ua |
|
Contact (name, position, telephone N, e-mail) |
Head – Ravlyck Vasyl, tel. +38(03739)22631 |
Investment proposal (project) application form of BROWNFIELD land lot