Investment proposal (project) application form of GREENFIЕLD land lot
Опубліковано 15 серпня 2015 року о 13:13

General  information

Title of the investment proposal (project)

Construction of the recreational complex «Stanchyna»

Location (district, city/village, street), land photo, scheme of location

 

Bahna vil., Vyzhnytsia district, Chernivtsi region

 

Owner (owners)

Community of Bahna vil.

Available documents, that certify the ownership (official act, certificate of ownership)

General plan of construction

Preliminary cost (balanced cost, assessed value) ths. UAH

100,0

The actual usage

Pasture

Technical parameters of a land lot

Area of the available land lot, ha

45,4

Border surroundings (description, scheme)

Borders on the state forestry

Level difference on the land lot, m

50 m

Cadastral end use

Pasture

Proposed end use

For construction of touristic and recreational center,  skiing track

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the requirements of land ownership and good-neighborly relations

Utilities

Water (availability, parameters)

Distance to the source of fresh water – 250 m

Drainage system (availability, parameters)

Not available

Supplying with gas (availability, parameters)

Distance to the gas supplying net – 3,1 km.  

Electricity (availability, parameters)

Distance to the available electrical substation -1 km

Availability

Ways of communication to the object  (autoroads, railways)

Automobile gravel road

The nearest international airport, km, time

International airport «Chernivtsi», 70 km, 1 hour.

The nearest entry point, km

Entry point «Porubne», 90 km

The nearest autoroads of international and national significance, km

Distance to the auto-road Р62 «Chernivtsi – Storozhynets – Vyzhnytsia» – 6 km

The nearest railway station, km

Railway station «Vyzhnytsia», 12 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Bahna village council

Contact (name, position, telephone N, e-mail)

Proshchiuk Vasyl – tel.: +38(03730)65413;

Kordiak Ivan – tel.: +38(03730)65431; e-mail: [email protected]

 

 

Investment proposal (project) application form of GREENFIELD land lot

General  information

Title of the investment proposal (project)

Construction of a brick producing factory

Location (district, city/village, street), land photo, scheme of location

 

N.Synivtsi vil., Hlyboka district, Chernivtsi region

 

Owner (owners)

Synivtsi village council

Available documents certifying the ownership (official act, certificate of ownership)

Documents are not available. Land lots are located outside the village.

Preliminary cost, ths. UAH

No monetary estimation

The actual usage

Free of use

Conditions of usage

Selling auction of land ownership or tenant right

Technical parameters of a land lot

Area of the available lot of land, ha

4,5

Border surroundings (description, scheme)

Next to the gravel road T 2606, living zone – 300 m.

Level difference on the land lot, m

Flat ground

Cadastral end use

Lands of a brick factory

Proposed end use

For industrial building

Ground-based obstacles (risk of flood and landslide, ecological conditions)

 No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

No limitations 

Utilities

Water (availability, parameters)

Well (300 m), possibility to drill a well

Drainage system (availability, parameters)

Installation of the autonomic system of treatment facilities

Supplying with gas (availability, parameters)

Not available

Electricity (availability, parameters)

Transmission facilities (0,4 kw) on the land lot

Availability

Ways of communication to the object  (autoroads, railways)

 Automobile gravel road

The nearest international airport, km, time

International airport «Chernivtsi» – 45 km, 60 min

The nearest entry point, km

Entry point (Romania), CP «Porubne» – 7 km

The nearest autoroads of international and national significance, km

Auto-road «Porubne – Chernivtsi» – 4 km

The nearest railway station, km

Railway station «Hlyboka» – 25 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Synivtsi village council, head – Masir Volodymyr, tel.: +38(03734)52642, mob. +38(050)1881302

 

Investment proposal (project) application form of GREENFIELD land lot

General  information

Title of the investment proposal (project)

Construction of a commercial pavilion, a storage room and establishment of a children’s playground

Location (district, city/village, street), land photo, scheme of location

 

The center of the Turiatka village, Hlyboka district of Chernivtsi region

 

Owner (owners)

Turiatka village council

Available documents certifying the ownership (official act, certificate of ownership)

Lands of reserve of Turiatka village council

Preliminary cost, ths. UAH

120,0

The actual usage

Free of use

Conditions of usage

Selling auction of land ownership or tenant right

Technical parameters of a land lot

Area of the available lot of land, ha

0,30

Border surroundings (description, scheme)

Borders on the autoroad, objects of public building

Level difference on the land lot, m

Flat ground

Cadastral end use

For farming

Proposed end use

For public building

Ground-based obstacles (risk of flood and landslide, ecological conditions)

 No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

Necessity of conversion into the category of lands of living and public buildings according to the general plan of settlement, land and economic plan with observance of state standards and building rules. 

Utilities

Water (availability, parameters)

Possibility to drill a well

Drainage system (availability, parameters)

Installation of the autonomic system of treatment facilities

Supplying with gas (availability, parameters)

Not available

Electricity (availability, parameters)

Transmission facilities on the land lot –  0,4 kw

Availability

Ways of communication to the object  (autoroads, railways)

Next to the gravel auto-road T2606

The nearest international airport, km, time

International airport «Chernivtsi» – 45 km, 60 min

The nearest entry point, km

 CP «Porubne» –  12 km

The nearest autoroads of international and national significance, km

12 km

The nearest railway station, km

Railway station «Hlyboka» – 28 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Turiatka village council, Head – Dutkovych Ivan, tel.: +38(03734)53131, mob. +38(050)5601938

 

Investment proposal (project) application form of GREENFIЕLD land lot

General  information

Title of the investment proposal (project)

Creation of a new production in Zastavna industrial zone of Chernivtsi region

Location (district, city/village, street), land photo, scheme of location

 

Bazhanskoho str., Zastavna, Zastavna district

 

Owner (owners)

Community of Zastavna in the person of the city council

Available documents that certify the ownership (official act, certificate of ownership)

Lands of reserve of Zastavna city council

Preliminary cost, ths. UAH

1408,6

The actual usage

 For personal farming

Technical parameters of a land lot

Area of the available lot of land, ha

2

Border surroundings (description, scheme)

Borders on the railway station of the branch «Verenchanka – Vikna Bukovyny», surfaced road, repair facilities, available land lots for extension.

Level difference on the land lot, m

Flat ground, level difference – up to 1 m

Cadastral end use

For personal farming

Proposed end use

Industrial production

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No risks of flood or landslide

Underground obstacles (level of surface and subterranean waters)

Lower than 10 m

Limitations in use (due to construction, ecology etc.)

No ecological or constructional limitations. Land lot is located outside the safeguard zone.

Utilities

Water (availability, parameters)

Central water supplying and drainage system. Distance to the connection point – 100 m.

Drainage system (availability, parameters)

Supplying with gas (availability, parameters)

Pipeline of medium pressure – 300 m

Electricity (availability, parameters)

Available transformer substation (10 kw) – 20 m

Availability

Ways of communication to the object  (autoroads, railways)

Hard-surfaced auto-road

The nearest international airport, km, time

International airport «Chernivtsi» – 45 km, 60 min

The nearest entry point, km

Entry point (Moldova) «Mamalyha – Criva» – 84 km

The nearest autoroads of international and national significance, km

E 85 «Ternopil – Chernivtsi», 5 km

The nearest railway station, km

Railway station «Verenchanka» – 7 km; the branch of railway «Verenchanka – Vikna Bukovyny»  serves only transportation of goods – 50 m.

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Department of economic development and infrastructure of Zastavna district state administration (http://zastavnaeconomy.at.ua), Zastavna city council: www.zmr.gov.ua

Contact (name, position, telephone N, e-mail)

Stasiuk Volodymyr, the deputy head of the department of economic development and infrastructure, tel./fax:

+38(03737)31989, e-mail: [email protected]. Tsurkan Yaroslav – head of Zastavna city council,

tel.: +38(03737)31390, e-mail: [email protected]

 

Investment proposal (project) application form of GREENFIЕLD land lot 

                                                             General  information

Title of the investment proposal (project)

Construction and usage of a recreational complex

Location (district, city/village, street), land photo, scheme of location

 

«Tutovniki» stow (out of Makarivka vil.), Kelmentsi district, Chernivtsi region

 

Owner (owners)

Manager – the Main Department of State Committee of Land Resourses

Available documents, that certify the ownership (official act, certificate of ownership)

Not available

Preliminary cost (balanced cost, assessed value) ths. UAH.

Not available

The actual usage

Free of use

Technical parameters of a land lot

Area of the available land lot, ha

2,0 ha

Border surroundings (description, scheme)

Borders: on the East – Dniester riverside; on the North, West and South – lands of agricultural exploitation.

Level difference on the land lot, m

6-7º

Cadastral end use

Lands of agricultural exploitation

Proposed end use

Construction for a recreational usage

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the nature protection requirements

Utilities

Water (availability, parameters)

Water tower in Makarivka vil. – 1,5 km

Drainage system (availability, parameters)

Not available

Supplying with gas (availability, parameters)

Possibility of supplying with gas, distance to the available gas pipe line – 9 km.  

Electricity (availability, parameters)

Distance to the available electrical substation – 1 km

Availability

Ways of communication to the object  (autoroads, railways)

Automobile roads; distance to the nearest settlement (Makarivka vil.) 0,5 km (unsurfaced road).

The nearest international airport, km, time

International airport  «Chernivtsі» – 111 km, 1 hour 30 min.

The nearest entry point, km

Entry point «Кelmentsі» – 30 km

The nearest autoroads of international and national significance, km

Distance to the auto-road Р63 Кrokva - Vartykivtsi - Ivanivtsi - Checkpoint «Rososhany» –14 km

The nearest railway station, km

Railway station «Lenkivtsi» – 7 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Kelmentsi district state administration,  www.kelmenci.oda.cv.ua

Contact (name, position, telephone N, e-mail)

Korol Serhii – The chief of  investment and tourism sector of economic development department, Kelmentsi district state administration, tel.: +38(03732) 20699, e-mail: [email protected]

 

Investment proposal (project) application form of GREENFIЕLD land lot 

General  information

Title of the investment proposal (project)

Construction and Servicing  of a Commercial Complex or Wayside Service Center

Location (district, city/village, street), land photo, scheme of location

 

Kitsman district, Berehomet vil., Holovna str.

 

Owner (owners)

Community of Berehomet vil. of  Kitsman district

Available documents certifying the ownership (official act, certificate of ownership)

Not available

Preliminary cost, ths. UAH

1 256,993

The actual usage

Free of use

Technical parameters of a land lot

Area of the available lot of land, ha

0,68

Border surroundings (description, scheme)

Borders on the auto-road and domestic building

Level difference on the land lot, m

Flat ground 

Cadastral end use

Commercial

Proposed end use

Commercial 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

 No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the conditions and limitations of land lot development, defined in the documentation of territory development

Utilities

Water (availability, parameters)

There is a necessity of construction of self-contained source of water supplying

Drainage system (availability, parameters)

There is a necessity of the installation of local treatment facility

Supplying with gas (availability, parameters)

Gas supplying network and power network border on  the  land lot

Electricity (availability, parameters)

Availability

Ways of communication to the object  (autoroads, railways)

Auto-road of a state significance

The nearest international airport, km, time

International airport «Chernivtsi» – 27 km, 45 min

The nearest entry point, km

Entry point (Romania), CP«Porubne» – 62 km

The nearest autoroads of international and national significance, km

Borders on the auto-road of a state significance     Н-10/М-19 «Stryi – Ivano-Frankivsk – Chernivtsi –Mamalyha/Domanove-Kovel-Chernivtsi-Terebleche»

The nearest railway station, km

Railway station «Oroshany» – 5 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Berehomet village council;

 59332, Chernivtsi region, Kitsman district, vil. Berehomet, Holovna str., 24

Contact (name, position, telephone N, e-mail)

Venhreniuk Bohdana – land surveyor; e-mail: [email protected], tel.: +38(03736)64183

 

Investment proposal (project) application form of GREENFIЕLD land lot

General  information

Title of the investment proposal (project)

Construction and servicing of the Industrial Production Complex

Location (district, city/village, street), land photo, scheme of location

 

Kitsman district, Revakivtsi vil.

 

Owner (owners)

State property

Available documents certifying the ownership (official act, certificate of ownership)

Not available

Preliminary cost, ths. UAH

1 061,650

The actual usage

Free of usage

Technical parameters of a land lot

Area of the available lot of land, ha

0,96

Border surroundings (description, scheme)

Borders on lands of «Bruk-Bet Ltd» and lands of village council

Level difference on the land lot, m

Flat ground 

Cadastral end use

Commercial

Proposed end use

Commercial 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

 No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to conditions and limitations of land lot development defined in the territory development documentation

Utilities

Water (availability, parameters)

There is a necessity of construction of water supplying self-contained source

Drainage system (availability, parameters)

There is a necessity of placing a treating facility

Supplying with gas (availability, parameters)

Gas supplying network and power network border on the land lot

Electricity (availability, parameters)

Availability

Ways of communication to the object  (autoroads, railways)

The gravel auto-road

The nearest international airport, km, time

International airport «Chernivtsi» – 27 km, 45 min

The nearest entry point, km

Entry point (Romania), «Porubne», 63 km

The nearest autoroads of international and national significance, km

Borders on the auto-road of a state significance     Н-10/М-19 «Stryi – Ivano-Frankivsk – Chernivtsi – Mamalyha/Domanove – Kovel – Chernivtsi – Terebleche» – 0,5 km

The nearest railway station, km

Railway station «Oroshany» – 5 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Berehomet village council,

24, Holovna str., Berehomet vil., Kitsman district, Chernivtsi region, 59332

Contact (name, position, telephone N, e-mail)

Venhreniuk Bohdana – specialist in land management; e-mail: [email protected], tel.: +38(03736)64183

 

Investment proposal (project) application form of GREENFIELD land lot

General  information

Title of the investment proposal (project)

Development of the frontier infrastructure in Mamalyha vil.

Location (district, city/village, street), land photo, scheme of location

 
   

 

 

 

 

 

 

 

 


Mamalyha vil., Novoselytsia district, Chernivtsi region

 
   

 

Owner (owners)

Lands of reserve of Mamalyha village council

Available documents certifying the ownership (official act, certificate of ownership)

Cadastral plan of the land lot

 

Preliminary cost, ths. UAH

Starting price - 5 UAH/m2 (according to the leasing agreement). Starting price – 40 UAH /m2 (for sale).

The actual usage

Tillage

Technical parameters of a land lot

Area of the available lot of land, ha

3,0

Border surroundings (description, scheme)

Borders on: the North – international auto-road; the South – lands of Lviv railway; the East – lands of CP «Mamalyha»; the West – lands of reserve of Mamalyha village council

Level difference on the land lot, m

Flat ground

Cadastral end use

For farming

Proposed end use

For objects of service zone

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

Underground obstacles (level of surface and subterranean waters)

Underground communication cable, 2,2 m under ground

Limitations in use (due to construction, ecology etc.)

Necessity of conversion into the category of lands of living and public buildings according to the Land and Economic Plan

Utilities

Water (availability, parameters)

Distance to the artesian well – 0,1 km

Drainage system (availability, parameters)

Installation of the autonomic system of treatment facilities

Supplying with gas (availability, parameters)

Possibility to connect to gas supplying network of Mamalyha vil. – 100 m

Electricity (availability, parameters)

Available, 0,4 kw  (up to 100 m)

Availability

Ways of communication to the object  (autoroads, railways)

International auto-road Stryi – Ivano-Frankivsk – Mamalyha (to Kyshyniv)

The nearest international airport, km, time

International airport «Chernivtsi» – 52 km, 60 min

The nearest entry point, km

Next to entry point (Moldova), CP «Mamalyha» (Customs post of Kelmentsi Customs)

The nearest autoroads of international and national significance, km

Next to international autoroad Stryi – Ivano-Frankivsk – Mamalyha

The nearest railway station, km

1,5 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Novoselytsia district state administration

 

Contact (name, position, telephone N, e-mail)

Istratii Liudmyla, tel. +38(03733)20990, mob. tel. +38(050)6906101

 

Investment proposal (project) application form of GREENFIЕLD land lot 

                                                             General  information

Title of the investment proposal (project)

Construction of a tourist complex

Location (district, city/village, street), land photo, scheme of location

 

Meshkova str., Putyla, Putyla district, Chernivtsi region

 

Owner (owners)

Putyla city council

Available documents, that certify the ownership  (official act, certificate of ownership)

 Lands of reserve of  Putyla city council

Preliminary cost (balanced cost, assessed value) ths. UAH

3000

The actual usage

Pasture

Technical parameters of a land lot

Area of the available land lot, ha

2,05 ha

Border surroundings (description, scheme)

Lands of reserve of  Putyla city council

Level difference on the land lot, m

Up to1,5 m

Cadastral end use

For construction and servicing

Proposed end use

For construction of the tourist complex

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the requirements of land ownership and good-neighborly relations

Utilities

Water (availability, parameters)

Distance to the source of fresh water – 250 m

Drainage system (availability, parameters)

Distance to the town drainage system – 400 m.  

Supplying with gas (availability, parameters)

Not available

Electricity (availability, parameters)

Electrical substation with the capacity of 380 kw

Availability

Ways of communication to the object  (autoroads, railways)

Borders on the auto-road with hard surface Т 2601

The nearest international airport, km, time

International airport «Chernivtsi» – 120 km., 120 min.

The nearest entry point, km

Checkpoint «Ruska» – 35 km

The nearest autoroads of international and national significance, km

Distance to the road of a regional significance - 550 m, to the state road – 15 km

The nearest railway station, km

«Vyzhnytsia», 45 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Economic department of Putyla district state administration

Contact (name, position, telephone N, e-mail)

Chopa  Roman –  the head of economic department of the district state administration, tel.: +38(03738) 21292; e-mail: [email protected]

 

Investment proposal (project) application form of GREENFIЕLD land lot

Загальна інформація

Title of the investment proposal (project)

Construction of the recreational complex «Chystyi Vidpochynok»

Location (district, city/village, street), land photo, scheme of location

 

«Vyshneva» stow, Lomachyntsi, Sokyriany district, Chernivtsi region

 

Owner (owners)

Manager – the Main Department of State Committee of Land Resourses

Available documents, that certify the ownership (official act, certificate of ownership)

Not available

Preliminary cost (balanced cost, assessed value) ths. UAH.

Not  available

The actual usage

Free of use

Technical parameters of a land lot

Area of the available land  lot  , ha

20,0

Border surroundings (description, scheme)

Area of the State Enterprise «Sokyriany forestry»; borders on the lands in usage of the Dniester-Prut basin department of water resources

Level difference on the land lot, m

20,0

Cadastral end use

For recreational purposes

Proposed end use

For construction of a recreational complex

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles, ecological conditions are satisfactory

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

Riverside

Utilities

Water (availability, parameters)

Distance to a water supplying source – 100 m

Drainage system (availability, parameters)

Not available

Supplying with gas (availability, parameters)

Distance to a source of gas supply – 500 m

Electricity (availability, parameters)

Distance to a source of electricity – 200 m

Availability

Ways of communication to the object  (autoroads, railways)

Gravel auto-road – 500 m

The nearest international airport, km, time

International airport «Chernivtsi»–150 km, 3  hours

The nearest entry point, km

International border crossing point «Sokyriany – Oknytsia», 25 km

The nearest autoroads of international and national significance, km

Chernivtsi – Kamianets-Podilskyi, 90 km (hardsurfaced road)

The nearest railway station, km

«Sokyriany» – 25 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Lomachyntsi village

Contact (name, position, telephone N, e-mail)

V.Todorovych – The head of the village council, tel.:  +38(03739)22083, +38(03739)58321

 

Investment proposal (project) application form of GREENFIЕLD land lot

                                                             General  information

Title of the investment proposal (project)

Organization of fuel pellets production from timber by-products

Location (district, city/village, street), land photo, scheme of location

 

Panska str., Komarivtsi vil., Storozhynets district

 

 

Owner (owners)

Komarivtsi village council

Available documents, that certify the ownership (official act, certificate of ownership)

Certificate of ownership

Preliminary cost (balanced cost, assessed value) ths. UAH.

2 623,19028

The actual usage

Free of use

Technical parameters of a land lot

Area of the available land lot, ha

7,9708

Border surroundings (description, scheme)

Borders on the lands of reserve of village council and private land lots.

Level difference on the land lot, m

Flat ground

Cadastral end use

Allocation and exploitation of the main and auxiliary buildings and constructions of the plants of processing, machine-building and other industries. 

Proposed end use

Allocation and exploitation of the main and auxiliary buildings and constructions of the plants of processing, machine-building and other industries. 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

No limitations

Utilities

Water (availability, parameters)

Distance to the nearest water source (river) – 700 m.

Drainage system (availability, parameters)

Not available

Supplying with gas (availability, parameters)

Distance to the gas-pipe - 200 m

Electricity (availability, parameters)

Distance to the transformer facilities - 100 m

Availability

Ways of communication to the object  (autoroads, railways)

Gravel auto-road with the width 6 m.

The nearest international airport, km, time

International airport «Chernivtsi» – 40 km. (30 min.), «Lviv» – 280 km. (4 h.)

The nearest entry point, km

«Krasnoilsk» – 35 km, «Porubne» – 55 km

The nearest autoroads of international and national significance, km

Distance to the state road   Р-62 – 100 m

Distance to the international road – 25 km

The nearest railway station, km

«Storozhynets» - 15 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Komarivtsi village council

Contact (name, position, telephone N, e-mail)

Bazhura S. – the head of the Komarivtsi village council, tel. +38(037235)43300, e-mail: [email protected]

 

Investment proposal (project) application form of GREENFIЕLD land lot

Загальна інформація

Title of the investment proposal (project)

Creation of an agricultural company for production and sales of grain crops, grain legumes, industrial crops, potato plants and vegetables

Location (district, city/village, street), land photo, scheme of location

    

Dankivtsi, Khotyn district, Chernivtsi region

 

 

 

 

 

 Owner (owners)

Manager –  the Main Department of the State Committee of Land Resourses

Available documents, that certify the ownership (official act, certificate of ownership)

Not available

Preliminary cost (balanced cost, assessed value) ths.  UAH.

Not available

The actual use

Free of use

Technical parameters of a land lot

Area of the available land  lot, ha

31,8

Border surroundings (description, scheme)

Borders on agricultural lands

Level difference on the land lot, m

Flat ground

Cadastral end use

Lands of agricultural designation

Proposed end use

For farming, agricultural and goods production

 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles, ecological conditions are satisfactory

 

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the nature protection requirements

Utilities

Water (availability, parameters)

Not available, distance to the nearest source – 1 m

Drainage system (availability, parameters)

Not available, distance to the nearest source – 12 m

Supplying with gas (availability, parameters)

Not available, distance to the nearest source – 1 m

Electricity (availability, parameters)

Not available, distance to the nearest saurce – 1 m

Availability

Ways of communication to the object  (autoroads, railways)

Gravel auto-roads – 1 km

The nearest international airport, km, time

International airport «Chernivtsi», 70 km, 1 hour

The nearest entry point, km

CP «Mamalyha», 50 km

The nearest autoroads of international and national significance, km

Auto-road «Zhytomyr - Chernivtsi - Terebleche» – 7 km

The nearest railway station, km

«Kamianets-Podilskyi» – 27 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Khotyn district state administration,

http:// khotyn.oda.cv.ua/

Contact (name, position, telephone N, e-mail)

Blahodushko Olha – the main specialist of the sector of social and economic development of  department of economic development and infrastructure of  Khotyn district state administration, tel.: +38(03731)21729

 

Investment proposal (project) application form of GREENFIЕLD land lot

General  information

Title of the investment proposal (project)

Creation of an agricultural company for production  and sales of grain crops, grain legumes, industrial crops, potato plants and vegetables

Location (district, city/village, street), land photo, scheme of location

    

Kaplivka vil., Khotyn district, Chernivtsi region

 

 

 

 

 

 

 

 

 

 

 

 

Owner (owners)

Manager – the Main Department of the State Committee of Land Resourses

Available documents, that certify the ownership (official act, certificate of ownership)

Not available

Preliminary cost (balanced cost, assessed value) ths. UAH

Not available

The actual usage

Free of usage

Technical parameters of a land lot

Area of the available land lot, ha

17,2

Border surroundings (description, scheme)

Borders on  agricultural lands

Level difference on the land lot, m

Flat ground

Cadastral end use

Lands of agricultural designation

Proposed end use

For farming, agricultural and goods production

 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles, ecological conditions are satisfactory

 

Underground obstacles (level of surface and subterranean waters)

No obstacles

Limitations in use (due to construction, ecology etc.)

According to the  nature protection requirements

Utilities

Water (availability, parameters)

Not available, distance to the nearest source –  2 km

Drainage system (availability, parameters)

Not available, distance to the nearest source – 10 m

Supplying with gas (availability, parameters)

Not available, distance to the nearest source –  2 m

Electricity (availability, parameters)

Not available, distance to the nearest source –  2 m

Availability

Ways of communication to the object  (autoroads, railways)

Gravel auto-roads – 1 km

The nearest international airport, km, time

International airport «Chernivtsi» – 75 km, 1 hour

The nearest entry point, km

Checkpoint «Mamalyha», 50 km

The nearest autoroads of international and national significance, km

Autoroad «Zhytomyr - Chernivtsi - Terebleche» – 7 km

The nearest railway station, km

«Kamianets-Podilskyi» – 27 km

Contact information

Proposal  is provided by (organization, name of owner,  Internet page )

Khotyn district state administration,

 http:// khotyn.oda.cv.ua/

Contact (name, position, telephone N, e-mail)

Blahodushko Olha – the main specialist of the sector of social and economic development of  department of economic development and infrastructure of  Khotyn district state administration, tel.: +38(03731)21729

 

Investment proposal (project) application form of GREENFIЕLD land lot

General  information

Title of the investment proposal (project)

Creation of a municipal plant for solid waste treatment  and utilization

Location (district, city/village, street), land photo, scheme of location

Khotyn, Khotyn district, Chernivtsi region

Location on the City general plan

 

Owner (owners)

Property of the Khotyn territorial community, the land lot is in usage of the utility plant «Khotynblahoustrii»

Available documents, that certify the ownership (official act, certificate of ownership)

Not available

Preliminary cost (balanced cost, assessed value) ths. UAH

Land sales price – 40 UAH per 1 m2

Land leasehold right sales price – 5 UAH per 1 m2

Owner (owners)

In usage as a municipal dump

Technical parameters of a land lot

Area of the available land lot, ha

7,6 ha

Border surroundings (description, scheme)

Lands of Khotyn territorial community  

Level difference on the land lot, m

Up to 1 m

Cadastral end use

Lands of reserve of Khotyn city council

Proposed end use

For  storage and treatment of the municipal solid waste 

Ground-based obstacles (risk of flood and landslide, ecological conditions)

No obstacles

 

Underground obstacles (level of surface and subterranean waters)

Level of surface and subterranean waters – 4 m

 

Limitations in use (due to construction, ecology etc.)

According to the legislature  in the sphere of solid waste management

Utilities

Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux